Monobloc
A single outdoor unit direction that keeps the refrigeration circuit outside the building, supporting simpler installation concepts.
Heat pump platforms
Hecosun develops heat pump platform directions with international HVAC channels, installers, brand owners and project partners. This page introduces the three product categories we work across, the configuration directions behind them and how a partnership typically moves forward.
Category 01
Platform directions for space heating, and for combined heating and domestic hot water, aimed at colder-climate and boiler-replacement routes to market.
Product definition is shaped with each partner around application, channel and market requirements, so final configurations are agreed project by project rather than taken from a fixed catalogue.
Category 02
Platform directions for domestic hot water, including all-in-one directions that integrate the tank into a single appliance for residential and light-commercial programmes.
Each direction is developed with distributors, installers and brand partners around channel positioning, installation realities and market-specific requirements.
Category 03
Platform directions for pool and leisure heating, aimed at specialist pool channels and HVAC partners extending their seasonal offer.
Collaboration focuses on product definition and market positioning; performance details are confirmed during technical discussion rather than on this page.
Platform & configuration
Three structure directions and one refrigerant direction frame current platform planning. These are directions for discussion, not published specifications.
A single outdoor unit direction that keeps the refrigeration circuit outside the building, supporting simpler installation concepts.
A direction that separates indoor and outdoor units, considered where installation practice or market preference calls for it.
A tank-integrated direction for hot-water platforms, combining storage and heat pump in one appliance concept.
R290 is the refrigerant direction prioritised in platform planning. Final refrigerant and configuration choices are confirmed per project.
Clear scope: no performance figures, capacities or certification claims are published on this page. Technical details are shared and confirmed during project discussions.
Partnership process
Five typical stages of a product partnership. Scope and timing are agreed per project; no fixed lead times are promised here.
Share your market, channel and application intent so we understand what the product direction needs to achieve.
Application, configuration and integration questions are worked through with our product and engineering contacts.
Where a direction fits, evaluation samples and supporting documentation are arranged for your assessment.
A first limited order validates product, documentation and market fit before any scaling decision.
Ongoing supply with agreed quality, communication and after-sales coordination for the long term.
Selection questions
Answers describe how we work. Anything project-specific is confirmed during discussion rather than assumed here.
Yes. OEM/ODM collaboration shapes product direction around your brand, channel and local-market requirements. What can be adapted, and to what extent, is worked out during technical discussion.
Our heat pumps can be considered for systems built with compatible third-party PV, battery, inverter and EMS/HEMS solutions. Hecosun does not currently offer its own storage or inverter products, and integration details are confirmed per project.
This page describes product directions, not specifications. Capacities, efficiency figures and operating limits depend on the final configuration and are documented and confirmed during the evaluation stage.
Product and technical documentation appropriate to the project stage is shared as evaluation progresses. Compliance and certification status for a specific market is discussed openly and confirmed project by project.
We work with partners on international routes to market. Market-specific requirements are addressed through localisation work during the project rather than assumed in advance.
Start the conversation